Premium/Packaged Drinking Water
Introduction of aaima in the market
H2o innvations pvt ltd is a large diversified company with a strong presence in various sectors. Here’s a professional introduction you can use for a water bottling plant under a limited company. Aaima engineering limited is proud to introduce its state-of-the-art water bottling plant, established with a commitment to delivering pure, safe, and high-quality drinking water. Our plant is equipped with modern technology and follows international standards in filtration, purification, and packaging to ensure the utmost hygiene and safety.
Our mission is to promote health and well-being by providing clean and affordable drinking water while maintaining eco-friendly and sustainable practices in our operations. The remarkable expertise and technicality along with years of experience are the strong instrument of our organizational growth. Our workforce including engineers, structure designer, r&d executives and other professionals work in the closely knitted co-ordination so as to develop innovative and highly functional mineral water treatment plants which are consistent in water quality
Key Highlights Of Indian Water Bottle Market
- Revenue in the bottled water segment amounts to us$5.74bn in 2023. The Market is expected to grow annually by5.18% (cagr 2023-2027).
- In global compatison, most revenue is generated in the united states (us$94.07bn in 2023)
- In relation to total population figures, per person revenues of us$4.04 are Generated in 2023.
- By 2027,5% of spending and 2% of volume consumption in the bottled water Segment will be attributable to out-of-home consumption (e.G., in bars and Restaurants).
- In the bottled water segment, volume is expected to amount to 28.14bn Lby2027. .
- The bottled water segment is expected to show a volume growth of.0% in 2024.
- The average volume per person in the bottled water segment is expected to Amount to 17.05lin 2023.
Government Support And Subsidies Msme:
The transformative journey of cgtmse has begun with change of its logo…. The new logo a “colorful flying bird” depicts giving wings to entrepreneurial zeal of million of youth of this great country who are having bankable business ideas but lack collateral security and/or third party guarantee to access credit from formal source… here cgtmse extends them helping hand by providing guarantee to enable them access credit leading to setting up viable micro and small enterprises. Thereby transforming them from job seekers to job providers and meaningfully
The lender should cover the eligible credit facilities as soon as they are sanctioned. Guarantee will commence from the date of payment of guarantee fee and shall run through the agreed tenure of the term credit in case of term loans / composite loans and for a period of 5 years where working capital facilities alone are extended to borrowers, or for such period as may be specified by the guarantee trust in this behalf.
| Category (including Trading activity) |
Maximum extent of Guarantee Coverage where guaranteed credit facility is |
||
|---|---|---|---|
| Upto ₹ 5 lakh | Above ₹ 5 lakh & upto ₹ 50 lakh | Above ₹ 50 lakh & upto ₹ 500 lakh | |
| Micro Enterprises | 85% | 75% | 75% |
| MSEs located in North East Region (incl. Sikkim, UT of Jammu & Kashmir & UT of Ladakh) |
80% | 80% | 75% |
| Women entrepreneurs / SC/ST entrepreneurs / Person with Disability (PwD) / MSE promoted by Agniveers / MSEs situated in Aspirational District / ZED certified MSEs |
85% | 85% | 85% |
| All other category of borrowers | 75% | 75% | 75% |
Basis and Presumptions
- It is presumed that the unit will run single shift of 8 hours per dayand 365 Days in a year.
- The minimum guarantee in case of buyback option will be applicable only After the commercial production of water bottles commences and not Otherwise.
- The rate ofinterest has beentaken 8% on an average for fixed investment
- To achieve full production 1 to 2months’ trial production required
- The salaries and wages, cost of raw material, utilities, conversion costs Etc. Are based on prevailing rates in and around local region at the time of preparation and are subject to necessary changes from time to time Based on local conditions.
Implementation schedule
The approximate time required for various activities is given below. However, it may vary from place to place depending upon the local circumstances and enthusiasm of the entrepreneur:
Due to overlapping of some activities, normally 6-8 months are required to implement the project.
| Implementation Schedule | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| S.no. | Activity / Time | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 1 | Scheme Preparation & Approval | ||||||||
| 2 | Sanction of Loan | ||||||||
| 3 | Clearance from State Pollution Control Board | ||||||||
| 4 | Placement of order for Machinery and delivery | ||||||||
| 5 | Installation of Machines & Power connection | ||||||||
| 6 | Trial Run | ||||||||
| 7 | Commercial Production | ||||||||
1. Details of machinery: 30 bpm
Packaged drinking water plant: 30 bpm
The details of machinery along with costing is listed below
Detailed cost of machinery
| SYSTEM | SR. NO | DESCRIPTION | RS. |
|---|---|---|---|
| WATER PURIFICATION SYSTEM | |||
| SYS-1 | 1 | MINERAL WATER PLANT – 2000 LPH WITH DUAL MEDIA FILTER, ACTIVATED CARBON FILTER, PRE AND POST TREATMENT, 2 SS TANK, UV SYSTEM, OZONE SYSTEM | 620,000 |
| QUALITY CONTROL LAB | 0 | ||
| SYS-2 | 2 | MICRO & CHEMICAL LAB AS PER BUREAU OF INDIAN STANDARDS – LAB INCL. CHEMICALS, GLASS WARE, EQUIPMENTS, MEDIA & GENERAL ITEMS | 200,000 |
| RINSING, FILLING, CAPPING & PACKING MACHINARIES | |||
| SYS-3 | 3 | 30 BPM FULLY AUTOMATIC BOTTLING MACHINE – FILLING, CAPPING & SEALING MACHINE WITH RINSING TABLE & LABEL SHRINK TUNNEL, HMI & PLC BASED | 780,000 |
| 4 | STICKER LABELLING MACHINE | 250,000 | |
| 5 | NEXT GENERATION DIGITAL BATCH CODING MACHINE | 200,000 | |
| 6 | SEMI-AUTOMATIC BULK SHRINK WRAPPING MACHINE – 3/4 PKT PM | 150,000 | |
| 7 | BLOW MOULDING MACHINE – POWER 30 KW | 1,000,000 | |
| TOTAL PRICE ENTIRE MACHINERY AS ABOVE | 3,200,000 | ||
| GST | 576,000 | ||
| INCLUDE GST | 3,776,000 |
Cost of Project
| Cost of Project | Amount (in Rs.) |
|---|---|
| Land | – |
| Building and Civil Work | – |
| Machinery | 3,776,000 |
| EXTRA SITE ERECTION CHARGE | 300,000 |
| Consulting fee for BIS/FSSAI | 100,000 |
| Total | 4,176,000 |
Scheducle of Exclusions
- All civil works, such as plant building, shed, foundation of equipment’s, bolts, pipe supports, supporting structures, platforms and mass concreting.
- Construction of drain sump and drain channels and any special lining.
- Plant area, building illumination, ventilation and earthling.
- Supply of power to motors and water.
- Raw water storage tank.
- All pipe work beyond our termination points.
- Layout of the equipment’s, piping, cabling and erection has been considered as per our standard layout design. All piping, cabling, erection etc. Required, as per client’s specific requirement subsequent to order finalization shall be at extra cost.
Design codes standards, features, specifications and supply of all items, quantity,





Reviews
There are no reviews yet.